Logo Floc Systems Inc
  • How It Works?
  • Industries
    • Construction
    • Pipelines
    • Mining
  • Request A Demo
  • About
    • Our Team
    • The Company
  • Products
    • TigerFloc Water Treatment Kit
    • TigerFloc Floc Sock Box (5 Socks)
    • TigerFloc Tube
    • TigerFloc Flocculant Belt/Sock
    • TigerFloc Flocculant Agent (50lb)
    • TigerFloc Dewatering Bag
    • Super Belt
    • Mini Belt 1lb
    • Mini Belt 1/2lb
  • Resources
    • Industry Insights
    • Success Cases
    • Solutions
    • FAQs
  • Contact
0 Items
Practical Solutions for Treating Excess Water During Early Site Development

Practical Solutions for Treating Excess Water During Early Site Development

24 Apr, 2026 | Water Treatment

Early site development is often the most water-intensive phase of a construction project. Clearing, grading, trenching, and excavation disturb soil and expose fine particles that easily become suspended in runoff. When combined with rainfall or groundwater intrusion,...
Managing High Sediment Levels in Construction Runoff Before the Build Begins

Managing High Sediment Levels in Construction Runoff Before the Build Begins

4 Apr, 2026 | Water Treatment

Before foundations are poured or structures rise, construction sites often face one of their earliest operational challenges: managing sediment-heavy runoff. Clearing, grading, and excavation disturb large volumes of soil, increasing the risk of suspended solids...
Sustainable Sediment Control Practices for Environmentally Sensitive Areas

Sustainable Sediment Control Practices for Environmentally Sensitive Areas

24 Mar, 2026 | Water Treatment

Construction and infrastructure projects located near streams, wetlands, agricultural land, or protected habitats face heightened environmental scrutiny. Even minor sediment discharge can affect aquatic ecosystems, reduce water clarity, and disrupt downstream...
Using Natural Flocculants to Reduce Environmental Impact on Active Job Sites

Using Natural Flocculants to Reduce Environmental Impact on Active Job Sites

4 Mar, 2026 | Water Treatment

Active construction and infrastructure projects inevitably generate sediment-laden water. Excavation, grading, trenching, and concrete work disturb soil, while rainfall and groundwater introduce additional volumes of turbid runoff. If not properly managed, this water...
Common Compliance Challenges in Turbid Water Management and How to Address Them

Common Compliance Challenges in Turbid Water Management and How to Address Them

24 Feb, 2026 | Water Treatment

Managing turbid water on construction and infrastructure sites is not simply an operational task; it is a regulatory requirement. Disturbed soil, excavation activities, and rainfall can quickly generate sediment-laden runoff that must be treated before discharge....
Meeting Construction Site Water Discharge Requirements Without Project Delays

Meeting Construction Site Water Discharge Requirements Without Project Delays

4 Feb, 2026 | Water Treatment

Construction sites generate significant volumes of turbid water during excavation, grading, trenching, and concrete work. Rainfall and groundwater intrusion can quickly turn active work areas into sediment-heavy runoff zones. At the same time, municipal and provincial...
« Older Entries
Next Entries »

Recent Posts

  • 4 Effective Ways to Use Sediment Dewatering Bags on Site
  • NTU in Water Treatment: Get Clear on Turbidity Readings
  • 5 Turbidity Treatment Steps to Stop Costly Site Runoff
  • Mastering Construction Site Environmental Inspections and Water Reviews
  • Proven Ways to Adapt a Temporary Water Treatment System to Changing Water Volumes

Recent Comments

No comments to show.

Company

HomeAbout Floc SystemsProductsContact

Industries

ConstructionPipelinesMining

Resources

How It WorksSolutionsSuccess CasesIndustry Insights

Contact

1 (877) 228-2124info@flocsystems.com

12992 76 Ave #212
Surrey, BC V3W 2V6

Discuss Your Project

Follow Floc Systems

  • Follow
  • Follow
  • Follow
  • Follow
Privacy PolicyTerms & ConditionsRefund & ReturnsCancellation & Delivery

© 2026 Floc Systems Inc. All rights reserved. Created by Future-Ready Consulting